Production Facilities

World-class brewing infrastructure built for scale, precision, and excellence. Our Simrol plant is one of the most advanced breweries in Central India — and we're just getting started.

Simrol, Indore — Madhya Pradesh

Engineering the Future of Indian Brewing

20M+
Cases / Year
10L
Hectolitres Capacity
9 mo
Build Time
1st
Canning Line in MP
B
20M
Cases Per Year

Annual installed brewing capacity serving 9+ states across India

C
1st
MP Canning Line

Madhya Pradesh's first state-of-the-art automated canning line

Q
100%
Quality Focus

Every batch tested and verified against the highest international standards

E
25+
Years Operating

Over two decades of continuous, award-winning brewing excellence

The Heart of MEBL

The Simrol Brewery — Built to Last

Situated at Simrol in Indore, Madhya Pradesh, the MEBL brewery is one of the most advanced brewing facilities in Central India. From the day it was founded in 1999, the plant has been continuously upgraded to meet growing demand and evolving quality standards.

With an installed capacity of 10 lakh hectolitres per annum — equivalent to 1.5 million cases per month at peak production — the Simrol plant is the engine that powers every brand in the MEBL portfolio.

9
Months to build. What would typically take years was achieved in just nine months — a testament to MEBL's ambition, focus, and operational excellence from day one.
MEBL Simrol Brewery, Indore

Infrastructure & Technology

Our production capabilities span every stage of the brewing cycle — from raw material handling to finished product dispatch.

01

Brewing & Fermentation

State-of-the-art brewing vessels with precise temperature and pressure control ensure consistency across every batch. Our fermentation tanks are designed for both efficiency and flavour integrity.

02

Automated Canning Line

MP's first fully automated canning line, installed in 2017–19, enables high-speed, hygienic packaging at scale. It supports all major MEBL brands and formats with zero compromise on quality.

03

Quality Control & Testing

A dedicated in-house quality lab conducts rigorous testing at every stage — raw materials, in-process checks, and finished goods — ensuring each bottle and can meets our exacting standards before it leaves the facility.

04

Effluent Treatment & Sustainability

We operate a modern effluent treatment plant that processes wastewater responsibly. Combined with rainwater harvesting and energy optimisation initiatives, our facility is engineered with sustainability at its core.

MEBL Canning Line
A First for Madhya Pradesh

The Canning Line That Changed Everything

When MEBL commissioned Madhya Pradesh's first canning line in 2017, it marked a turning point — not just for MEBL, but for the entire state's beverage industry. The new line dramatically expanded our production capacity and opened the door to new format offerings for consumers.

Today, our canning operations run at scale, supporting brands like STOK, Lemount, and Mount across geographies. The line represents MEBL's commitment to staying ahead of the market — investing in infrastructure before demand requires it.

MP's First Automated Canning Line — 2017

Visit Our Facility

Our Simrol plant is located in the heart of Madhya Pradesh, easily accessible from Indore city. For facility visits, investor tours, or partnership enquiries, please get in touch.

Simrol, Indore – 453771
Madhya Pradesh, India
Get in Touch